Use case

Prepare the permit-to-work pack

General Inference reads the job request, the isolation list, the risk assessment, the JSA and past permits for the same equipment, and prepares the permit pack in the form your site already uses. It checks that gas tests, certificates and competent persons are named and in date, and flags gaps. The competent person still signs before work starts.

Talk to us about thisAll use cases

Who it is for

Refineries, oil and gas, and gas processing

Hot work, confined space entry and electrical isolation each need their own permit, often under OISD-STD-105 or the operator's own system.

Power plants and utilities

Shutdowns bring hundreds of permits in a few weeks, with isolations, lock-out and contractor crews on the same equipment.

Chemical, pharma and process plants

Maintenance on lines and vessels that held hazardous material needs draining, purging, gas tests and a named authoriser every time.

How it is done today

Permits are copied from the last one

The issuer takes an old permit, changes the tag number and date, and misses that this job is near a live line or a different chemical. The hazard check happens in someone's head.

Shutdowns swamp the permit office

In a turnaround, permit issuers face a queue of contractor crews every morning. Isolation lists, JSAs and gas test records are checked in a hurry.

Certificates and competence lapse quietly

A crane's load test, a welder's qualification or a gas detector's calibration expired last month. Nobody checks until an incident or an audit asks.

What you get

  • A draft permit in your site's own form: cold work, hot work, confined space, electrical or work at height
  • The isolation list for the equipment, checked against your P&IDs and the last isolation on the same tag
  • A JSA and risk assessment draft, with hazards from past permits and incidents on the same equipment
  • Certificates, calibrations and competent persons named, with expired ones flagged
  • Conflicts with other open permits on the same area or system

How it works

1. Share the job and your site files

Raise the job request or upload the shutdown work list. Connect your permit forms, isolation lists, P&IDs, past permits and certificate registers.

2. It reads and checks the job

Past permits, incidents and isolations on the same equipment are read. Certificates, gas detector calibration and competent persons are checked for dates.

3. It drafts the permit pack

The permit, isolation list, JSA and attached certificates are drafted in your form, each item linked to its source.

4. The competent person checks and signs

Gaps are flagged first, and a person still reviews every line. The issuer and the competent person check the site, do the gas test and sign before work starts.

An example

Example: a refinery in Gujarat has a hot work job to replace a 6-inch valve on a naphtha line during a planned shutdown.

Past permits read7 permits on the same line in the last 3 years
Isolation list4 isolation points, 2 spectacle blinds, drawn from the P&ID and the last job
FlaggedLast permit on this line needed a nitrogen purge; not in today's request
CertificatesWelder qualification in date; portable gas detector calibration expired 12 days ago
Clashes1 open cold work permit on the adjacent pump

Illustration with a made-up company, not customer data.

What it reads, and what you decide

It works from

  • Your permit forms and permit-to-work procedure
  • Isolation lists, P&IDs and equipment tag registers
  • Risk assessments, JSAs and past permits
  • Incident and near-miss reports
  • Certificates: lifting gear, gas detectors, welders, contractors
  • The shutdown or maintenance work list

You still decide

  • Whether the job goes ahead, and when
  • The isolations, gas tests and precautions on site
  • Who the competent person and the permit holder are
  • When the permit is signed, extended or closed

Worth knowing

  • A UK HSE study, 'Dangerous Maintenance', found 30% of reported incidents in the chemical industry involved maintenance, and inadequate or missing permit-to-work systems were implicated in 20% of those. (IChemE Symposium Series 139, 1995 (HSE paper))
  • The same HSE work found only 20% of companies had hazard identification as a step on the permit form. It was often done 'in the authoriser's head'. (IChemE Symposium Series 139, 1995 (HSE paper))
  • The US Chemical Safety Board counted over 60 deaths since 1990 from fires and explosions during hot work on tanks, and calls hot work one of the most common causes of worker death in its investigations. (US Chemical Safety Board)

Questions

Who signs the permit?

The competent person and the permit issuer your procedure names, as today. The workspace prepares the pack. People check the site, do the gas test and sign. The activity trail records who prepared and who approved.

Does it issue or close permits on its own?

No. It drafts the pack and flags gaps. Issuing, extending and closing a permit stay with your people on site. Nothing is issued or sent by the system.

Does it replace our permit system or CMMS?

No. It reads your forms, work orders and registers where they live, on paper scans, in your CMMS exports or in an e-permit system. That system stays the record.

Can it use our own permit format?

Yes. The pack is drafted in the forms your site already uses, whether that follows OISD-STD-105, your operator's system or your own procedure.

Is this running at a plant today?

Not yet. The same core runs on real tenders at a valve maker in India. Permit packs are set up for you on your own forms, isolation lists and past permits.

Related

Close deviations and CAPA

Drafts deviation, NCR and incident reports and the CAPA that follows, from your batch records, SOPs and HAZOP actions. QA signs the report and the CAPA.

Get ready for the audit

Builds the evidence pack for ISO 9001, 14001 and 45001, customer and statutory audits from your own records, mapped to each clause. Your quality head signs it.

Renew before it lapses

Tracks licences, consents, certificates, insurance and bank guarantees by expiry date, and drafts each renewal pack in time. The owner signs before it is filed.