Manufacturers and process plants
A factory licence, CTO, fire NOC, PESO licence, boiler certificates and ISO certificates each run on their own clock and their own form.
Use case
General Inference reads your licences, consents, certificates, insurance policies and bank guarantees, and builds one register of what expires when, with the conditions attached. Well before each date it drafts the renewal pack: the form, the compliance reports and the supporting documents from your files, with gaps flagged. The owner or the person you name signs before it is filed.
Talk to us about thisAll use casesA factory licence, CTO, fire NOC, PESO licence, boiler certificates and ISO certificates each run on their own clock and their own form.
An expired ISO, BIS or IBR approval, or an old certificate in a bid, can knock you off a vendor list or out of a tender.
Performance and advance bank guarantees, insurance and labour licences must be extended or released project by project.
Dates sit in an Excel sheet, a diary or the accountant's memory. When that person is on leave or leaves, a renewal slips.
A consent renewal needs analysis reports, the environmental statement and proof that conditions were met. Collecting them takes weeks, and starts days before the deadline.
An expired fire NOC, boiler certificate or consent can halt production. An expired certificate in a tender gets the bid rejected.
Upload or connect the folders that hold licences, consents, certificates, insurance policies and bank guarantees, including scans.
Each document is read for its number, issuer, validity and conditions. Dates are checked against your own register and the renewal lead time.
Ahead of each date, the form, supporting reports and covering letter are drafted in the issuer's format, each value linked to its source.
Gaps and near dates are flagged first, and a person still reviews every line. The owner or the person you name signs, and your team files it.
Example: a chemicals maker in Ankleshwar with two plants shares 9 years of licences, consents, certificates and guarantees.
| Documents read | 64 licences, consents, certificates, policies and bank guarantees |
|---|---|
| Due in the next 120 days | 7, including the CTO for plant 2 and the fire NOC |
| Already lapsed | 1 boiler certificate on a standby boiler, 3 weeks ago |
| CTO renewal pack | Form drafted; 2 of 4 quarterly analysis reports found, 2 missing |
| Bank guarantees | 3 performance guarantees to extend, 1 ready to ask the buyer to release |
Illustration with a made-up company, not customer data.
The owner, or the person you name for each licence. The workspace prepares the pack. A person reviews and signs, and the activity trail records who prepared and who approved.
No. It drafts the pack and the form values. Your team files on the regulator's portal or with the bank. Nothing is sent or submitted by the system.
No. It reads your documents and your existing register, and keeps them in step. Your ERP and accounts stay the record for guarantees and policies.
It is flagged with the page, not guessed. A person confirms the date before it goes in the register.
The same core runs on real tenders at a valve maker in India, where it already checks certificates against tender requirements. Renewal tracking is set up for you on your own documents.
Reads new circulars, notifications and standards, summarises each one and shows which of your own procedures, products and permits it affects. You decide.
Builds the evidence pack for ISO 9001, 14001 and 45001, customer and statutory audits from your own records, mapped to each clause. Your quality head signs it.
Reads GeM, CPPP, state and PSU tenders, checks eligibility and preferences against your files and prepares the bid file. Your team still submits on the portal.
Tell us about one job your team still does by hand.
Email usOr write to anirudh@generalinference.co