EPC and civil contractors
Roads, water, power and building contractors who raise RA bills every month and argue variations and time extensions with the client's engineer.
Use case
General Inference reads your contract, BOQ, drawings, measurement records, site diaries and correspondence, and drafts the running-account bill or the claim: variations, extra items, extension of time, delay, demurrage or warranty. Each line points to the clause, drawing or letter behind it, and notice deadlines are tracked. Your contracts lead reviews and approves before anything is issued.
Talk to us about thisAll use casesRoads, water, power and building contractors who raise RA bills every month and argue variations and time extensions with the client's engineer.
Electrical, piping, HVAC and structural firms who bill the main contractor against measurements and chase extra items and held-back retention.
Valve, pump, cable and steel suppliers on project orders who claim for delayed dispatch clearance, idle stock, demurrage or warranty disputes.
Measurements sit in the MB and site registers, rates in the BOQ, approvals in letters and drawing revisions in someone's mail. The QS stitches them into an RA bill every month, by hand.
A hindrance, a drawing issued late or an instruction to do extra work needs written notice within the contract's time. Site is busy, the letter goes late, and the right to claim is weakened or lost.
The client's engineer sends a claim back because the clause is not cited, the hindrance register does not match, or the rate analysis for an extra item is missing. Money stays stuck for months.
Upload or connect the contract, BOQ, drawings, measurement sheets, site diaries, hindrance register and correspondence, including scans.
Quantities are matched to BOQ items, events to contract clauses, and dates to notice periods. Mismatches between the MB, drawings and letters are flagged.
The RA bill, deviation statement or claim is drafted in your format or the client's, with each line pointing to the page it came from.
Gaps and near deadlines are flagged first, and a person still reviews every line. The contracts lead approves, and your team issues it.
Example: a civil contractor in Nagpur on a ₹180 crore water supply project prepares RA bill 14 and an extension-of-time claim after a 5-month pipeline delay.
| BOQ items measured this period | 212 of 230, 18 with no measurement this month |
|---|---|
| Beyond BOQ quantity | 6 items, including DI pipe 600 mm at 118% of the BOQ quantity |
| Extra items | 3, one without a signed site instruction on file |
| Hindrances found | 11 in the register; 9 matched to letters, 2 with no notice on file |
| EOT claim drafted | 142 days, with the clause, a delay table and 38 linked letters |
| Deadline flagged | Notice for the latest road-cutting permission delay due in 4 days |
Illustration with a made-up company, not customer data.
Your contracts lead, QS or project manager, as you set it. The workspace drafts and flags. A named person approves, and the activity trail records who prepared and who approved.
No. Nothing is sent or uploaded by the system. Your team issues the approved bill or claim on your letterhead, by mail or on the client's portal, as you do today.
No. It reads exports and reports from your ERP or billing tool alongside the contract and site files. Your existing system stays the record for accounts.
Yes. It reads the conditions in your contract, whichever form they take, and tracks the notice periods and clauses written there. It does not assume one standard form.
It says so. A missing measurement, unsigned instruction or late notice is flagged as a gap for your team to fix. It does not fill in a number it cannot find.
See who has to sign what, by when, and what is stuck, under your own approval rules. Reminders go to the person holding it up. Your people still decide.
Ask a question of years of correspondence, drawings, contracts, specs and past bids. Every answer points to the page it came from. Owners confirm what sticks.
A one-page brief on a customer, tender or project before you walk into the meeting, drawn from your mail, orders and files, with the source for every line.
Tell us about one job your team still does by hand.
Email usOr write to anirudh@generalinference.co