Equipment makers bidding to EPCs and utilities
Valve, pump, transformer and switchgear specifications run to hundreds of clauses, and the buyer wants a reply to each one.
Use case
General Inference reads the tender, technical specification and general conditions, splits them into clauses, and checks each one against your data sheets, certificates and standard terms. It drafts a comply, deviate or clarify sheet with the source page for every line, and flags conflicts between documents. Your bid owner signs off every deviation.
Talk to us about thisAll use casesValve, pump, transformer and switchgear specifications run to hundreds of clauses, and the buyer wants a reply to each one.
Owner specifications, general conditions and project standards must be answered clause by clause before the technical bid is opened.
Evaluators reject a bid with a material deviation, so every exception has to be visible and deliberate.
An engineer pastes the specification into a sheet, line by line, and types comply next to most of them. On a 300-clause spec, that is two or three days of work.
Under deadline, a clause on material, testing or warranty gets a comply that your product or terms do not meet. The buyer holds you to it after the order.
Liquidated damages, performance security, payment terms and governing law sit in a separate document. A deviation there can make the whole bid non-responsive.
Upload the tender, specification and conditions. Connect your data sheets, certificates, standard terms and past matrices.
Each clause is read, including scanned pages and tables, and checked against what your product and terms actually offer.
Each clause gets a proposed comply, deviate or clarify, with the reason and the page it relies on. Deviations are listed first.
Exceptions are flagged first, and a person still reviews every line. The bid owner accepts, changes or rejects each deviation before the matrix goes into the offer.
Example: a transformer maker in Nashik answers a 410-clause specification from a state power utility for 12 distribution transformers.
| Clauses read | 410, across the specification, GCC and SCC |
|---|---|
| Proposed comply | 381, each with the data sheet or certificate it relies on |
| Proposed deviate | 9, including a no-load loss limit below your standard design |
| Proposed clarify | 20, such as a test standard named two ways in two sections |
| Conflict found | Specification asks for copper windings; the price schedule says aluminium |
| Waiting on you | Whether to accept the 10% liquidated damages cap in the SCC |
Illustration with a made-up company, not customer data.
Your bid owner. Each deviation and clarification is a proposal until a named person accepts it. Every decision is recorded with who made it and when.
No. It drafts the matrix for your team. Your staff put it into the offer and submit it through your own process. Nothing is sent or submitted by the system.
No. It reads your data sheets, certificates and terms where they already sit. Your document system stays the record.
Every line shows the page of the tender and the page of your own file it relies on. If there is no evidence in your files, the line is marked for a person instead of comply.
Reads an RFQ and its attachments, matches each line to your catalogue, prices it from your own price list and drafts the quotation. Your team approves it.
Drafts pre-bid queries in the buyer's format before the cut-off and tracks replies, corrigenda and addenda against your offer. Your bid owner approves each one.
Checks every mandatory document, certificate, declaration, EMD and signature against the tender before you submit, and names each gap. Your signatory approves.
Tell us about one job your team still does by hand.